|
(b) Check for the canister operation.
(1) With the purge port closed, blow 2 kPa (20 gf/cm2, 0.3 psi) of air into the vent port, and check that air flows from the air inlet port.
If the result is not as specified, replace the canister assembly.
(2) With the vent port closed, blow 1 kPa (10 gf/cm2, 0.2 psi) of air inlet port, and check that air flows from the purge port.
If the result is not as specified, replace the charcoal canister assembly.
|